Sunrise Energy Project Sunrise Energy Project

Sunrise Energy Project

Fort McMurray, Alberta

The Sunrise field is estimated to hold 3.7 billion barrels of bitumen including 0.36 billion barrels of proved, 2.48 billion barrels of probable and 0.86 billion barrels of possible reserves. 国产私房ktv supported the front-end engineering design of Husky Energy鈥檚 120,000-barrel-per-day steam-assisted gravity drainage plant that produces oil from the Sunrise field. 国产私房ktv co-located with the designer to provide constructability reviews, estimates, construction execution plans, a labor plan and camp accommodation recommendations.

When the plant advanced to the construction phase, 国产私房ktv affiliate, Ganotec, fabricated and assembled 10 piperack modules and two electrical modules in their Edmonton yard. The scope of work included structural steel erection, pipe fabrication and installation, pressure testing of piping, installation of cable tray and electric heat tracing.

Performed over 150,000 manhours with zero recordables.